En français

ECCC logo

TOC > MSC data > WCPS > WCPS Changelog

Chronology of changes to the Water Cycle Prediction System (WCPS)

Tuesday January 21, 2020

Upgrade to Version 2.2.1 of WCPS adapted to the New High Performance Computing Infrastructure.

See details at this link

Wednesday July 3, 2019

Upgrade to Version 2.1.0 of the Water Cycle Prediction System (WCPS) at the Canadian Meteorological Centre (CMC)

Effective Wednesday July 3rd, 2019, the Canadian Meteorological Centre (CMC) of the Meteorological Service of Canada will update the Water Cycle Prediction System (WCPS) to v2.1.0.

The modifications to WCPS v2.1.0 compared with the previous operational version are as follows:

For more information, please consult the technical specifications document for WCPS v2.1.0 available at this link.

A technical note with more details on this change is available at this link.

Monday March 4, 2019

New Water Cycle Prediction System (WCPS) declared operational at the Canadian Meteorological Centre

On Monday March 4th 2019, the Meteorological Service of Canada's Canadian Meteorological Centre (CMC) declared operational the Water Cycle Prediction System (WCPS v2.0.0) after having run in experimental mode for almost 3 years.

A copy of the official note announcing this important implementation is available at this link.

A technical note with more details on this system is available at this link.

The technical specifications document for WCPS 2.0.0 is available at this link.